Skip to main content

Consolidation Business Rules How It Works

Execution Order

What runs first inside an action, between actions, and inside a process.

Inside Group Consolidation

The order is fixed:

  1. Currency conversion, if Run Currency Conversion with Consolidation is ticked.
  2. Copy of reporting-currency values to the groups.
  3. The rules under Eliminations and Auto Adjustments.
  4. Dependent formula metrics.

Among the attached rules, a rule whose result another rule reads runs first. Rules that do not depend on each other run at the same time.

Inside a rule

The lines of an Interco Eliminations or Auto Journal rule are added together, so their order does not change the result.

Between actions

Each action runs when you run it or when its trigger fires. Nothing runs Currency Conversion, Opening Balance Carry Forward, Auto Mapping and Group Consolidation in a set order for you; you decide the order you run them in.

Inside a process Activity

Data actions in an Activity step run one after another, in list order. With Enable Parallel Processing and Group by dimension or Group by property, the selected members are split into groups that run at the same time; each group runs the whole list for its own members.

What Happens When a Run Fails

The statuses a run can end with, and what each means.

Run statuses

Status

Meaning for an action run

In-Progress

Still running.

Success

Finished with no messages.

Warning

Finished, but a check stopped part of the work or an attached rule failed. The other attached rules still ran. Read the message.

Failed

An error stopped the run.

Checks that stop the work

Before converting or consolidating, the action checks the Exchange Rates and Ownership Structure sheets. If a check fails, nothing is converted or consolidated for that sheet, and the status is Warning. The messages are listed in Error Messages and Symptoms. A missing exchange rate does not stop the run: the amount converts to 0 and the message names the currency.

In a process Activity

If a data action stops with an error, the remaining data actions in that step (or in that parallel group) do not run. The step ends as Success if all succeeded, Failed if all failed, and Warning otherwise. Starting a run whose selection overlaps one still in progress gives "Please wait for previous calculation to be complete".

Runs that take too long

A run that exceeds the maximum time set for your environment is marked Failed with "Auto failed by the batch because the calculation execution exceeded the maximum elapsed time". This changes the status shown; check the results before you run the action again.

After a failure

Read the message, fix the cause, and run the action again. A new run replaces the results of the earlier one. See Run and Re-run.

What You Can Trace

Where to see that a run happened and what it reported, and where to see changes to rules.

Task Monitor

Open Governance → Monitor → Task Monitor. A run started from a sheet appears with Activity On-Demand Data Action and Task <sheet name>.<action name>, for example Group Close.Group Consolidation (example names). Click the row to open Task Log Details; the Message box shows any warnings and the number of records updated.

Each run started from a sheet also writes an entry to the Event Log.

Rules

  • Where Used in a rule's settings panel lists the sheets that use the rule.
  • On the rule's … menu in the Space tree, Version<n> opens the list of the rule's saved versions (Manage or Write access).

Was this article helpful?

We're sorry to hear that.